02/06/2021
Parc de l’Alba in a WHO publication on the redevelopment of contaminated sites
Parc de l’Alba in a WHO publication on the redevelopment of contaminated sites
The World Health Organization’s (WHO) Regional Office for Europe has recently issued a free downloadable titled “Urban redevelopment of contaminated sites: a review of scientific evidence and practical knowledge on environmental and health issues (2021)”.
The publication is the result of a project in which Parc de l’Alba (whose business area is known as Barcelona Synchrotron Park) was involved. This study is part of the Health and Environmental Impact Assessment Program of the WHO European Centre for Environment and Health.
The project focuses on the study of scientific evidence, the review of practical cases and the analysis of the impact assessment processes (SEA, EIA, HIA, HHRA, HBM*) in relation to the remediation and subsequent reuse of contaminated sites. The aim of the project is to provide tools and knowledge for local and regional administrations to improve the management of old polluted sites redevelopment, rehabilitating these soils, which are an opportunity for sustainable urban development by reducing the use of natural or unaltered spaces.
In this WHO project, the Parc de l’Alba has contributed its experience with the restoration of Àrids Catalunya, an old 4 ha clay quarry located within the Park's perimeter. Exploited until the 1970s and subsequently filled with various types of waste, basically construction debris, including asbestos, this quarry, transformed by the way into an uncontrolled landfill, represented a problem for the environment and health.
In 2010, this cuvette was restored and later redeveloped. The site is now fully restored and reforested with a viewpoint and new paths marked for public use, and since 2012 it has been officially part of the Parc de l'Alba green corridor.
* (SEA, Strategic Environmental Assessment; EIA, Environmental Impact Assessment; HIA, Health Impact Assessment; HHRA, Human Health Risk Assessment; HBM, Health Biomonitoring)
The publication is the result of a project in which Parc de l’Alba (whose business area is known as Barcelona Synchrotron Park) was involved. This study is part of the Health and Environmental Impact Assessment Program of the WHO European Centre for Environment and Health.
The project focuses on the study of scientific evidence, the review of practical cases and the analysis of the impact assessment processes (SEA, EIA, HIA, HHRA, HBM*) in relation to the remediation and subsequent reuse of contaminated sites. The aim of the project is to provide tools and knowledge for local and regional administrations to improve the management of old polluted sites redevelopment, rehabilitating these soils, which are an opportunity for sustainable urban development by reducing the use of natural or unaltered spaces.
In this WHO project, the Parc de l’Alba has contributed its experience with the restoration of Àrids Catalunya, an old 4 ha clay quarry located within the Park's perimeter. Exploited until the 1970s and subsequently filled with various types of waste, basically construction debris, including asbestos, this quarry, transformed by the way into an uncontrolled landfill, represented a problem for the environment and health.
In 2010, this cuvette was restored and later redeveloped. The site is now fully restored and reforested with a viewpoint and new paths marked for public use, and since 2012 it has been officially part of the Parc de l'Alba green corridor.
* (SEA, Strategic Environmental Assessment; EIA, Environmental Impact Assessment; HIA, Health Impact Assessment; HHRA, Human Health Risk Assessment; HBM, Health Biomonitoring)
More news
23/06/2016
Distributed Polygeneration: Barcelona Synchrotron Park Shares Its Experience
17/06/2016
Barcelona Synchrotron Park Sponsors the Fifth Ideas Generation Program
10/06/2016
The Nanoworld Is Designed and Observed In and Nearby Barcelona Synchrotron Park
02/06/2016
Mediterranean Corridor: an important infrastructure for Barcelona Synchrotron Park
26/05/2016
UAB University Makes Distance Wireless Charging a Reality
19/05/2016
HP Enters the 3D Printing Market