Close
28/01/2021
Institutional visit to the Elena Renewable Gas Plant in Parc de l'Alba

In Parc de l'Alba between 2007 and 2011, an excavation made as the result of a former clay extraction activity was used to store waste bales from Barcelona Metropolitan Area waste recovery plants.

The energy company Naturgy is finalising the implementation of a pioneering project in Spain, within the framework of the circular economy, to make use of the biogas produced by this deposit resulting from the decomposition of the organic matter present in the waste. This is the Elena Renewable Gas Plant, a facility capable of collecting the methane present in the biogas and injecting it into the natural gas distribution network, thus using the waste as an energy resource and at the same time avoiding its emission into the atmosphere.

The company points out that the Parc de l'Alba facility will be able to inject 12 GWh/year into the grid, equivalent to the consumption of 3,200 homes with natural gas, and will prevent the emission into the atmosphere of approximately 2,500 tonnes of CO2/year, equivalent to planting some 5,000 trees.

The institutional visit to the new plant took place last week and was attended by the CEO of Nedgia (Naturgy's gas distribution company), Narcís de Carreras; the Catalan Minister of Business and Knowledge, Ramon Tremosa; the Director General of Energy, Industrial Safety and Mining Safety, Manel Torrent; the Mayor of Cerdanyola del Vallès, Carlos Cordón; and the Director of the Parc de l'Alba, Pere Solà.

More news

24/07/2015 CVC: 20 Years Making Images Meaningful 17/07/2015 Presentation of the Industrial Ring 4.0 Project 13/07/2015 New International Success for B-Barcelona Consulting /BGC 02/07/2015 Creation of the Barcelona Institute of Science and Technology 26/06/2015 A Delegation From Porto Alegre Visits the Barcelona Synchrotron Park 17/06/2015 First light for PAU camera, designed to study dark energy
31 32 33 34 35 36 37 38 39 40 41