19/09/2019
The president of Catalonia visited the Barcelona Synchrotron Park
The president of Catalonia visited the Barcelona Synchrotron Park
“A country structure”: Barcelona Synchrotron Park director Pere Solà used that phrase to summarize the role of the park to the president of Catalonia Quim Torra during his visit on September 18.
The director explained the three missions of the Park: hosting innovative companies, building a new neighbourhood and protecting biodiversity. He particularly mentioned the future 30,000 jobs that will be generated, the 5,700 apartments (social protection floor for 47% of them) and the green corridor.
Regarding the new urban master plan about to enter the public information phase, Pere Solà pointed out, among other aspects, the future public transportation network and the original action plan in urban planning and health.
The president could have an accurate picture of this reality travelling by bus the 400 hectares of the park. He concluded his visit at Alba synchrotron where director Caterina Biscari took him to discover this iconic infrastructure, the largest science facility in the Iberian Peninsula.
At the end of the visit, the President announced that the government will invest a total of 25 million euros in the Alba Synchrotron: 20 to install four new beam lines that will be operational between 2020 and 2023, and 5 million euros to build the Advanced Microscopy Center.
The director explained the three missions of the Park: hosting innovative companies, building a new neighbourhood and protecting biodiversity. He particularly mentioned the future 30,000 jobs that will be generated, the 5,700 apartments (social protection floor for 47% of them) and the green corridor.
Regarding the new urban master plan about to enter the public information phase, Pere Solà pointed out, among other aspects, the future public transportation network and the original action plan in urban planning and health.
The president could have an accurate picture of this reality travelling by bus the 400 hectares of the park. He concluded his visit at Alba synchrotron where director Caterina Biscari took him to discover this iconic infrastructure, the largest science facility in the Iberian Peninsula.
At the end of the visit, the President announced that the government will invest a total of 25 million euros in the Alba Synchrotron: 20 to install four new beam lines that will be operational between 2020 and 2023, and 5 million euros to build the Advanced Microscopy Center.
More news
10/06/2015
The Barcelona Synchrotron Park in the SmartReFlex European project
01/06/2015
SENER and ALBA sign a technology transfer agreement
28/05/2015
Synchrotron light applications for the pharmaceutical industry
20/05/2015
Financial Times ranks ESADE 7th worldwide in open executive education programmes
14/05/2015
Joint promotion in Korea of the Barcelona Synchrotron Park and the Parc Científic de Barcelona
07/05/2015
The UAB ranks well