19/09/2019
The president of Catalonia visited the Barcelona Synchrotron Park
The president of Catalonia visited the Barcelona Synchrotron Park
“A country structure”: Barcelona Synchrotron Park director Pere Solà used that phrase to summarize the role of the park to the president of Catalonia Quim Torra during his visit on September 18.
The director explained the three missions of the Park: hosting innovative companies, building a new neighbourhood and protecting biodiversity. He particularly mentioned the future 30,000 jobs that will be generated, the 5,700 apartments (social protection floor for 47% of them) and the green corridor.
Regarding the new urban master plan about to enter the public information phase, Pere Solà pointed out, among other aspects, the future public transportation network and the original action plan in urban planning and health.
The president could have an accurate picture of this reality travelling by bus the 400 hectares of the park. He concluded his visit at Alba synchrotron where director Caterina Biscari took him to discover this iconic infrastructure, the largest science facility in the Iberian Peninsula.
At the end of the visit, the President announced that the government will invest a total of 25 million euros in the Alba Synchrotron: 20 to install four new beam lines that will be operational between 2020 and 2023, and 5 million euros to build the Advanced Microscopy Center.
The director explained the three missions of the Park: hosting innovative companies, building a new neighbourhood and protecting biodiversity. He particularly mentioned the future 30,000 jobs that will be generated, the 5,700 apartments (social protection floor for 47% of them) and the green corridor.
Regarding the new urban master plan about to enter the public information phase, Pere Solà pointed out, among other aspects, the future public transportation network and the original action plan in urban planning and health.
The president could have an accurate picture of this reality travelling by bus the 400 hectares of the park. He concluded his visit at Alba synchrotron where director Caterina Biscari took him to discover this iconic infrastructure, the largest science facility in the Iberian Peninsula.
At the end of the visit, the President announced that the government will invest a total of 25 million euros in the Alba Synchrotron: 20 to install four new beam lines that will be operational between 2020 and 2023, and 5 million euros to build the Advanced Microscopy Center.
More news
17/02/2016
Barcelona Synchrotron Park, a Park with a (Pre)History
10/02/2016
New mechanism of anti-tumour action for the new drug developped at the UAB
03/02/2016
Step in Barcelona
27/01/2016
ALBA News
21/01/2016
SENER celebrates its 60th anniversary
15/01/2016
Parc Tecnològic del Vallès: Arrival of FERRER and Accreditation of SEVIBE CELLS