16/02/2019
SENER: wind, sun and moon
SENER: wind, sun and moon
Three recent news from SENER give an opportunity to talk about two important business sectors of the engineering and construction multinational company whose Catalan branch is headquartered in the Barcelona Synchrotron Park: the energy sector and the aerospace sector.
The thermo solar plant in Kathu (South Africa) with a 100 MW installed capacity, built by SENER and ACCIONA Industrial, came into commercial operation on last January 30. The plant incorporates a molten salt system that can store solar heat and generate electricity in the absence of solar radiation.
On the other hand, SENER has recently announced that the company will be involved in a large floating offshore wind farm currently under construction by COBRA 15 km off the Scottish coast of Aberdeen. SENER contribution includes, among other things, the supervision of the floating platforms manufacture and the technical feasibility analysis of the wind turbines assembly. With a 50 MW nominal power, this project is expected to be operational by 2020, making it the largest floating offshore wind farm in the world.
Last but not least, SENER has just been awarded five contracts for the development phase of a future space station in lunar orbit within the framework of the Gateway project called to become the next international space station whose construction is planned for the 2020s (see image).
Congratulations!
More information
The thermo solar plant in Kathu (South Africa) with a 100 MW installed capacity, built by SENER and ACCIONA Industrial, came into commercial operation on last January 30. The plant incorporates a molten salt system that can store solar heat and generate electricity in the absence of solar radiation.
On the other hand, SENER has recently announced that the company will be involved in a large floating offshore wind farm currently under construction by COBRA 15 km off the Scottish coast of Aberdeen. SENER contribution includes, among other things, the supervision of the floating platforms manufacture and the technical feasibility analysis of the wind turbines assembly. With a 50 MW nominal power, this project is expected to be operational by 2020, making it the largest floating offshore wind farm in the world.
Last but not least, SENER has just been awarded five contracts for the development phase of a future space station in lunar orbit within the framework of the Gateway project called to become the next international space station whose construction is planned for the 2020s (see image).
Congratulations!
More information
More news
31/01/2015
Iranian entrepreneurs at the ALBA synchrotron
22/01/2015
What is a synchrotron and how it works?
15/01/2015
AFM2015 at ICMAB: Nanoscale Characterization of Functional Materials
08/01/2015
Ice under investigation: ICN2 and ICMAB sign an agreement with SnowWorld
23/12/2014
Kymos Pharma Services in the PTV
18/12/2014
Barcelona is one of the 20 best cities for students