16/02/2019
SENER: wind, sun and moon
SENER: wind, sun and moon
Three recent news from SENER give an opportunity to talk about two important business sectors of the engineering and construction multinational company whose Catalan branch is headquartered in the Barcelona Synchrotron Park: the energy sector and the aerospace sector.
The thermo solar plant in Kathu (South Africa) with a 100 MW installed capacity, built by SENER and ACCIONA Industrial, came into commercial operation on last January 30. The plant incorporates a molten salt system that can store solar heat and generate electricity in the absence of solar radiation.
On the other hand, SENER has recently announced that the company will be involved in a large floating offshore wind farm currently under construction by COBRA 15 km off the Scottish coast of Aberdeen. SENER contribution includes, among other things, the supervision of the floating platforms manufacture and the technical feasibility analysis of the wind turbines assembly. With a 50 MW nominal power, this project is expected to be operational by 2020, making it the largest floating offshore wind farm in the world.
Last but not least, SENER has just been awarded five contracts for the development phase of a future space station in lunar orbit within the framework of the Gateway project called to become the next international space station whose construction is planned for the 2020s (see image).
Congratulations!
More information
The thermo solar plant in Kathu (South Africa) with a 100 MW installed capacity, built by SENER and ACCIONA Industrial, came into commercial operation on last January 30. The plant incorporates a molten salt system that can store solar heat and generate electricity in the absence of solar radiation.
On the other hand, SENER has recently announced that the company will be involved in a large floating offshore wind farm currently under construction by COBRA 15 km off the Scottish coast of Aberdeen. SENER contribution includes, among other things, the supervision of the floating platforms manufacture and the technical feasibility analysis of the wind turbines assembly. With a 50 MW nominal power, this project is expected to be operational by 2020, making it the largest floating offshore wind farm in the world.
Last but not least, SENER has just been awarded five contracts for the development phase of a future space station in lunar orbit within the framework of the Gateway project called to become the next international space station whose construction is planned for the 2020s (see image).
Congratulations!
More information
More news
10/06/2015
The Barcelona Synchrotron Park in the SmartReFlex European project
01/06/2015
SENER and ALBA sign a technology transfer agreement
28/05/2015
Synchrotron light applications for the pharmaceutical industry
20/05/2015
Financial Times ranks ESADE 7th worldwide in open executive education programmes
14/05/2015
Joint promotion in Korea of the Barcelona Synchrotron Park and the Parc Científic de Barcelona
07/05/2015
The UAB ranks well