16/02/2019
SENER: wind, sun and moon
SENER: wind, sun and moon
Three recent news from SENER give an opportunity to talk about two important business sectors of the engineering and construction multinational company whose Catalan branch is headquartered in the Barcelona Synchrotron Park: the energy sector and the aerospace sector.
The thermo solar plant in Kathu (South Africa) with a 100 MW installed capacity, built by SENER and ACCIONA Industrial, came into commercial operation on last January 30. The plant incorporates a molten salt system that can store solar heat and generate electricity in the absence of solar radiation.
On the other hand, SENER has recently announced that the company will be involved in a large floating offshore wind farm currently under construction by COBRA 15 km off the Scottish coast of Aberdeen. SENER contribution includes, among other things, the supervision of the floating platforms manufacture and the technical feasibility analysis of the wind turbines assembly. With a 50 MW nominal power, this project is expected to be operational by 2020, making it the largest floating offshore wind farm in the world.
Last but not least, SENER has just been awarded five contracts for the development phase of a future space station in lunar orbit within the framework of the Gateway project called to become the next international space station whose construction is planned for the 2020s (see image).
Congratulations!
More information
The thermo solar plant in Kathu (South Africa) with a 100 MW installed capacity, built by SENER and ACCIONA Industrial, came into commercial operation on last January 30. The plant incorporates a molten salt system that can store solar heat and generate electricity in the absence of solar radiation.
On the other hand, SENER has recently announced that the company will be involved in a large floating offshore wind farm currently under construction by COBRA 15 km off the Scottish coast of Aberdeen. SENER contribution includes, among other things, the supervision of the floating platforms manufacture and the technical feasibility analysis of the wind turbines assembly. With a 50 MW nominal power, this project is expected to be operational by 2020, making it the largest floating offshore wind farm in the world.
Last but not least, SENER has just been awarded five contracts for the development phase of a future space station in lunar orbit within the framework of the Gateway project called to become the next international space station whose construction is planned for the 2020s (see image).
Congratulations!
More information
More news
31/03/2016
ICN2 Graphene-Based Sensors for Biomedicine and Brain-Machine Interfaces
21/03/2016
Halal Certification Awarded to Natura Bissé
16/03/2016
SENER is back to Mars
09/03/2016
Barcelona, 2016/17 Top European City for FDI Strategy
03/03/2016
NCD Beamline at ALBA Synchrotron: When X-Rays Make Chocolate Speak
24/02/2016
Barcelona DC Cluster from BSP at the 2016 Mobile World Congress Brokerage Event