Close
11/10/2018
Everything you’ve always wanted to know about Alba synchrotron
The ALBA Synchrotron has published its annual report. This document covers the most remarkable activities of 2017, a selection of scientific highlights, technology reviews and facts & figures of the facility last year.
 
At page 8, we read:
Alba in brief:
• User operations started in 2012 • 3 GeV 150 mA Top-Up operations with a current variation lower than 1% • 5900h of operation with 4650h user time - 98% availability • 21 M€ operation budget in 2017 • Proposals have increased from about 200 in 2012 to almost 400 in 2017. Average overboooking factor: 2 • User affiliation: 65% national, 30% European, 5% non-European • Eight beamlines in operation, three under construction, one under design and three pending approval”

To learn more about Alba: 110 other pages available here.
 

More news

03/01/2020 AllRead MLT, a success story originated from the PRUAB’s Ideas Generation Program 06/11/2019 SENER, a top-class aerospace systems provider 29/10/2019 The ICN2 research center is involved in the quantum revolution 21/10/2019 Stradivarius keeps growing 19/09/2019 The president of Catalonia visited the Barcelona Synchrotron Park 12/09/2019 Alba, a tool to tackle challenges in the fields of renewable energy production and fight against air pollution
2 3 4 5 6 7 8 9 10 11 12