11/10/2018
Everything you’ve always wanted to know about Alba synchrotron
Everything you’ve always wanted to know about Alba synchrotron
The ALBA Synchrotron has published its annual report. This document covers the most remarkable activities of 2017, a selection of scientific highlights, technology reviews and facts & figures of the facility last year.
At page 8, we read:
“Alba in brief:
• User operations started in 2012 • 3 GeV 150 mA Top-Up operations with a current variation lower than 1% • 5900h of operation with 4650h user time - 98% availability • 21 M€ operation budget in 2017 • Proposals have increased from about 200 in 2012 to almost 400 in 2017. Average overboooking factor: 2 • User affiliation: 65% national, 30% European, 5% non-European • Eight beamlines in operation, three under construction, one under design and three pending approval”
To learn more about Alba: 110 other pages available here.
At page 8, we read:
“Alba in brief:
• User operations started in 2012 • 3 GeV 150 mA Top-Up operations with a current variation lower than 1% • 5900h of operation with 4650h user time - 98% availability • 21 M€ operation budget in 2017 • Proposals have increased from about 200 in 2012 to almost 400 in 2017. Average overboooking factor: 2 • User affiliation: 65% national, 30% European, 5% non-European • Eight beamlines in operation, three under construction, one under design and three pending approval”
To learn more about Alba: 110 other pages available here.
More news
23/03/2020
ICN2 and CReSA at the forefront against COVID-19
10/03/2020
Barcelona Synchrotron Park publishes a guide to promote biodiversity in its buildings
27/02/2020
Batteries of the future are investigated in the ALBA synchrotron
10/02/2020
With Solar Orbiter, SENER approaches a star
27/01/2020
Welcome, Natura Bissé!
14/01/2020
The Alba Synchrotron has lots of tricks up its sleeve!