11/10/2018
Everything you’ve always wanted to know about Alba synchrotron
Everything you’ve always wanted to know about Alba synchrotron
The ALBA Synchrotron has published its annual report. This document covers the most remarkable activities of 2017, a selection of scientific highlights, technology reviews and facts & figures of the facility last year.
At page 8, we read:
“Alba in brief:
• User operations started in 2012 • 3 GeV 150 mA Top-Up operations with a current variation lower than 1% • 5900h of operation with 4650h user time - 98% availability • 21 M€ operation budget in 2017 • Proposals have increased from about 200 in 2012 to almost 400 in 2017. Average overboooking factor: 2 • User affiliation: 65% national, 30% European, 5% non-European • Eight beamlines in operation, three under construction, one under design and three pending approval”
To learn more about Alba: 110 other pages available here.
At page 8, we read:
“Alba in brief:
• User operations started in 2012 • 3 GeV 150 mA Top-Up operations with a current variation lower than 1% • 5900h of operation with 4650h user time - 98% availability • 21 M€ operation budget in 2017 • Proposals have increased from about 200 in 2012 to almost 400 in 2017. Average overboooking factor: 2 • User affiliation: 65% national, 30% European, 5% non-European • Eight beamlines in operation, three under construction, one under design and three pending approval”
To learn more about Alba: 110 other pages available here.
More news
29/10/2014
The BSP will be exhibiting at the Smart City Expo
22/10/2014
The BSP signs an alliance with B barcelona consulting
14/10/2014
UAB Inaugurates ICTA-ICP Building
08/10/2014
Visit of a BSP delegation to the Epson facilities
30/09/2014
Boehringer Ingelheim inaugurates its new ICT center
24/09/2014
Come discover the ALBA synchrotron