05/07/2018
Biogas injected into the natural gas grid
Biogas injected into the natural gas grid
Parc de l’Alba, which business area is known as Barcelona Synchrotron Park – also includes a future residential neighborhood and different green areas (half of the total surface of the park) with an iconic 1km-wide biologic corridor.
Between 2007 and 2011, an excavation made in one of these green plots as the result of an antic clay extraction activity was used to store waste bales from the Barcelona Metropolitan Area. Since the landfill has been closed, the biogas produced by the decomposition of bales organic material is extracted and burned in order to prevent the emission into the atmosphere.
To take advantage of the methane present in this biogas at a significant 60% concentration, Gas Natural Fenosa Spanish energy company (recently renamed Naturgy), is carrying out a project pioneer in Spain: setting up both an upgrading plant to filter methane and an injection plant to introduce this biomethane into the natural gas grid.
In order to make this project a reality, Cerdanyola del Vallès municipal authorities, on which Parc de l’Alba depends, has recently conceded a plot to Naturgy to build and operate the two plants scheduled to start operating early next year.
Between 2007 and 2011, an excavation made in one of these green plots as the result of an antic clay extraction activity was used to store waste bales from the Barcelona Metropolitan Area. Since the landfill has been closed, the biogas produced by the decomposition of bales organic material is extracted and burned in order to prevent the emission into the atmosphere.
To take advantage of the methane present in this biogas at a significant 60% concentration, Gas Natural Fenosa Spanish energy company (recently renamed Naturgy), is carrying out a project pioneer in Spain: setting up both an upgrading plant to filter methane and an injection plant to introduce this biomethane into the natural gas grid.
In order to make this project a reality, Cerdanyola del Vallès municipal authorities, on which Parc de l’Alba depends, has recently conceded a plot to Naturgy to build and operate the two plants scheduled to start operating early next year.
More news
10/05/2017
Barcelona Synchrotron Park’s Commitment to Nature and Biodiversity
04/05/2017
Reference research centres in the environment of the Barcelona Synchrotron Park
27/04/2017
SMEs discover the potential of the Barcelona Synchrotron Park
18/04/2017
Stradivarius has settled in the Barcelona Synchrotron Park
05/04/2017
The BSP is candidate to host the European Medicines Agency
30/03/2017
ALBA Synchrotron Gives Support to Companies