27/04/2017
SMEs discover the potential of the Barcelona Synchrotron Park
SMEs discover the potential of the Barcelona Synchrotron Park
The 20-person delegation representing different SMEs from the cities of Granollers and Montmeló that visited this week the ALBA synchrotron could see how this singular facility does not only serve the international scientific community: this electron accelerator that produces radiations used to observe the inner structure of materials is an infrastructure also useful and accessible to companies.
Actually, the ALBA industrial liaison office aims precisely at making companies know and use the wide range of unique material characterization tools ALBA offers to improve industrial processes and develop new products in very different sectors such as food, health, energy or nanotechnology.
The delegation also had the opportunity to discover the polygeneration power plant (photo): in order to reduce the environmental impact of its urban development, the Barcelona Synchrotron Park has designed and built a centralized heating and cooling system based on high efficiency polygeneration technologies that allow the simultaneous production of electricity (for ALBA) and heating and cooling distributed throughout the park. This approach helps reduce primary consumption and CO2 emission by 35% compared to conventional air-conditioning systems installed in each company.
This outsourced service allows companies to concentrate on their business, reduce their initial investment and the physical space to allocate to bulky equipment, reduce of some 20% the associated operating and maintenance costs and give flexibility if energy requirements change.
Actually, the ALBA industrial liaison office aims precisely at making companies know and use the wide range of unique material characterization tools ALBA offers to improve industrial processes and develop new products in very different sectors such as food, health, energy or nanotechnology.
The delegation also had the opportunity to discover the polygeneration power plant (photo): in order to reduce the environmental impact of its urban development, the Barcelona Synchrotron Park has designed and built a centralized heating and cooling system based on high efficiency polygeneration technologies that allow the simultaneous production of electricity (for ALBA) and heating and cooling distributed throughout the park. This approach helps reduce primary consumption and CO2 emission by 35% compared to conventional air-conditioning systems installed in each company.
This outsourced service allows companies to concentrate on their business, reduce their initial investment and the physical space to allocate to bulky equipment, reduce of some 20% the associated operating and maintenance costs and give flexibility if energy requirements change.
More news
28/01/2021
Institutional visit to the Elena Renewable Gas Plant in Parc de l'Alba
12/01/2021
2021: the Alba synchrotron begins its mutation
30/12/2020
The Park has a new Urban Development Master Plan
29/11/2020
The director of Parc de l'Alba, Pere Solà, academic director of the new Postgraduate Course in Urban Planning and Health at the UPC School
18/11/2020
Catalan minister Ramon Tremosa visits the ALBA synchrotron and announces the creation of a public-private investment fund to improve knowledge transfer
03/11/2020
Catalonia, at the forefront of Europe in life sciences and health; the Alba synchrotron contributes to this leadership