01/03/2017
How Biodiversity is Supported in the Barcelona Synchrotron Park
How Biodiversity is Supported in the Barcelona Synchrotron Park
Parc de l’Alba, which includes its business area promoted as BARCELONA SYNCHROTRON PARK (BSP), is a 340 ha park undergoing urban development that pays particular attention to nature conservation, ecological restoration and support to the biodiversity.
This commitment was awarded in 2016 by the European Commission "Business & Biodiversity" label.
Mixed uses integrate the BSP, a residential land sector and extensive green spaces (190 hectares) for the conservation of biodiversity. One of the most iconic features is the green corridor, a large area of some 140 ha.
The Parc de l’Alba’s action program designed to enhance its green infrastructure and support biodiversity can be downloaded here.
This program is broken down into 5 core areas described in the document:
COREA AREA 1. Ecological restoration
CORE AREA 2. Application of ‘nature-based solutions’
CORE AREA 3. Ecological management of green spaces and pending building areas
CORE AREA 4. Supporting agriculture
CORE AREA 5. Healthy and educational network of paths
Contact: Consol Pérez, cperez@parcdelalba.cat
This commitment was awarded in 2016 by the European Commission "Business & Biodiversity" label.
Mixed uses integrate the BSP, a residential land sector and extensive green spaces (190 hectares) for the conservation of biodiversity. One of the most iconic features is the green corridor, a large area of some 140 ha.
The Parc de l’Alba’s action program designed to enhance its green infrastructure and support biodiversity can be downloaded here.
This program is broken down into 5 core areas described in the document:
COREA AREA 1. Ecological restoration
CORE AREA 2. Application of ‘nature-based solutions’
CORE AREA 3. Ecological management of green spaces and pending building areas
CORE AREA 4. Supporting agriculture
CORE AREA 5. Healthy and educational network of paths
Contact: Consol Pérez, cperez@parcdelalba.cat
More news
05/07/2018
Biogas injected into the natural gas grid
29/06/2018
SENER celebrates 25 years in Catalonia
21/06/2018
Barcelona Synchrotron Park’s Commitment to Natural Capital
12/06/2018
50th anniversary: congratulations UAB!
06/06/2018
Natura Bissé: the construction of the new world headquarters is well on its way
30/05/2018
Les Dames de Cerdanyola make sense