01/03/2017
How Biodiversity is Supported in the Barcelona Synchrotron Park
How Biodiversity is Supported in the Barcelona Synchrotron Park
Parc de l’Alba, which includes its business area promoted as BARCELONA SYNCHROTRON PARK (BSP), is a 340 ha park undergoing urban development that pays particular attention to nature conservation, ecological restoration and support to the biodiversity.
This commitment was awarded in 2016 by the European Commission "Business & Biodiversity" label.
Mixed uses integrate the BSP, a residential land sector and extensive green spaces (190 hectares) for the conservation of biodiversity. One of the most iconic features is the green corridor, a large area of some 140 ha.
The Parc de l’Alba’s action program designed to enhance its green infrastructure and support biodiversity can be downloaded here.
This program is broken down into 5 core areas described in the document:
COREA AREA 1. Ecological restoration
CORE AREA 2. Application of ‘nature-based solutions’
CORE AREA 3. Ecological management of green spaces and pending building areas
CORE AREA 4. Supporting agriculture
CORE AREA 5. Healthy and educational network of paths
Contact: Consol Pérez, cperez@parcdelalba.cat
This commitment was awarded in 2016 by the European Commission "Business & Biodiversity" label.
Mixed uses integrate the BSP, a residential land sector and extensive green spaces (190 hectares) for the conservation of biodiversity. One of the most iconic features is the green corridor, a large area of some 140 ha.
The Parc de l’Alba’s action program designed to enhance its green infrastructure and support biodiversity can be downloaded here.
This program is broken down into 5 core areas described in the document:
COREA AREA 1. Ecological restoration
CORE AREA 2. Application of ‘nature-based solutions’
CORE AREA 3. Ecological management of green spaces and pending building areas
CORE AREA 4. Supporting agriculture
CORE AREA 5. Healthy and educational network of paths
Contact: Consol Pérez, cperez@parcdelalba.cat
More news
02/06/2021
Parc de l’Alba in a WHO publication on the redevelopment of contaminated sites
27/04/2021
Natura Bissé: when architecture reflects the brand identity
08/04/2021
ASTIP, the future hub for advanced research in the Barcelona Synchrotron Park
25/03/2021
4th anniversary of the setting up of Stradivarius headquarter in the Barcelona Synchrotron Park
05/03/2021
T-Systems, a leading IT service provider with a Data Centre in the Barcelona Synchrotron Park
18/02/2021
SENER participates in the Perseverance rover which is landing on Mars today