01/03/2017
How Biodiversity is Supported in the Barcelona Synchrotron Park
How Biodiversity is Supported in the Barcelona Synchrotron Park
Parc de l’Alba, which includes its business area promoted as BARCELONA SYNCHROTRON PARK (BSP), is a 340 ha park undergoing urban development that pays particular attention to nature conservation, ecological restoration and support to the biodiversity.
This commitment was awarded in 2016 by the European Commission "Business & Biodiversity" label.
Mixed uses integrate the BSP, a residential land sector and extensive green spaces (190 hectares) for the conservation of biodiversity. One of the most iconic features is the green corridor, a large area of some 140 ha.
The Parc de l’Alba’s action program designed to enhance its green infrastructure and support biodiversity can be downloaded here.
This program is broken down into 5 core areas described in the document:
COREA AREA 1. Ecological restoration
CORE AREA 2. Application of ‘nature-based solutions’
CORE AREA 3. Ecological management of green spaces and pending building areas
CORE AREA 4. Supporting agriculture
CORE AREA 5. Healthy and educational network of paths
Contact: Consol Pérez, cperez@parcdelalba.cat
This commitment was awarded in 2016 by the European Commission "Business & Biodiversity" label.
Mixed uses integrate the BSP, a residential land sector and extensive green spaces (190 hectares) for the conservation of biodiversity. One of the most iconic features is the green corridor, a large area of some 140 ha.
The Parc de l’Alba’s action program designed to enhance its green infrastructure and support biodiversity can be downloaded here.
This program is broken down into 5 core areas described in the document:
COREA AREA 1. Ecological restoration
CORE AREA 2. Application of ‘nature-based solutions’
CORE AREA 3. Ecological management of green spaces and pending building areas
CORE AREA 4. Supporting agriculture
CORE AREA 5. Healthy and educational network of paths
Contact: Consol Pérez, cperez@parcdelalba.cat
More news
28/01/2021
Institutional visit to the Elena Renewable Gas Plant in Parc de l'Alba
12/01/2021
2021: the Alba synchrotron begins its mutation
30/12/2020
The Park has a new Urban Development Master Plan
29/11/2020
The director of Parc de l'Alba, Pere Solà, academic director of the new Postgraduate Course in Urban Planning and Health at the UPC School
18/11/2020
Catalan minister Ramon Tremosa visits the ALBA synchrotron and announces the creation of a public-private investment fund to improve knowledge transfer
03/11/2020
Catalonia, at the forefront of Europe in life sciences and health; the Alba synchrotron contributes to this leadership