23/06/2016
Distributed Polygeneration: Barcelona Synchrotron Park Shares Its Experience
Distributed Polygeneration: Barcelona Synchrotron Park Shares Its Experience
In order to reduce the environmental impact of its urban development, Barcelona Synchrotron Park has designed and built a centralized heating and cooling system based on high efficiency polygeneration technologies that allow the simultaneous production of electricity, heating and cooling distributed throughout the park. This approach helps reduce primary consumption and CO2 emission by 35% compared to conventional air-conditioning systems installed in each company.
The first planned polygeneration power plant has being operative since 2010. Public-private “Poligeneració Parc de l’Alba ST4 S.A.” company designed and built the plant and currently operates it. The plant produces the high quality electricity ALBA synchrotron requires and provides all companies from the park with heating and cooling.
Due to its experience acquired in this field, Barcelona Synchrotron Park has been invited to a workshop organized on June 22 by Granollers city council (Barcelona area), Granollers Mercat and Vallès Oriental waste-management consortium on the theme “Heating distribution in industrial areas based on residual heating and other renewable energy sources”.
This workshop offered an opportunity to share know-how and experiences and to answer key questions about legal, technical and economic issues that city councils have to face to set up this type of infrastructures. End-users and industrial consumers issues were also tackled during the meeting.
The first planned polygeneration power plant has being operative since 2010. Public-private “Poligeneració Parc de l’Alba ST4 S.A.” company designed and built the plant and currently operates it. The plant produces the high quality electricity ALBA synchrotron requires and provides all companies from the park with heating and cooling.
Due to its experience acquired in this field, Barcelona Synchrotron Park has been invited to a workshop organized on June 22 by Granollers city council (Barcelona area), Granollers Mercat and Vallès Oriental waste-management consortium on the theme “Heating distribution in industrial areas based on residual heating and other renewable energy sources”.
This workshop offered an opportunity to share know-how and experiences and to answer key questions about legal, technical and economic issues that city councils have to face to set up this type of infrastructures. End-users and industrial consumers issues were also tackled during the meeting.
More news
28/01/2021
Institutional visit to the Elena Renewable Gas Plant in Parc de l'Alba
12/01/2021
2021: the Alba synchrotron begins its mutation
30/12/2020
The Park has a new Urban Development Master Plan
29/11/2020
The director of Parc de l'Alba, Pere Solà, academic director of the new Postgraduate Course in Urban Planning and Health at the UPC School
18/11/2020
Catalan minister Ramon Tremosa visits the ALBA synchrotron and announces the creation of a public-private investment fund to improve knowledge transfer
03/11/2020
Catalonia, at the forefront of Europe in life sciences and health; the Alba synchrotron contributes to this leadership