09/04/2015
Three important projects awarded to SENER
Three important projects awarded to SENER
The international engineering and technology group SENER whose Barcelona offices are located in the Barcelona Synchrotron Park, has been recently awarded three important projects.
The joint venture of SENER and AFCONS has recently signed an EPC contract with H-Energy Gateway Private limited (HEGPL), a Hiranandani Group Company, for turnkey engineering, procurement and construction (EPC) of its LNG storage and re-gasification project in Jaigad, Maharashtra. The capacity of the plant is 8 million tons per annum and facility construction is set to commence from mid this year.
The engineering and technology group SENER has also been awarded the contract for the Attitude and Orbit Control System (AOCS/GNC) on the space probe Euclid. This award makes SENER the prime contractor for this AOCS subsystem that requires the highest level of performance, and for a European Space Agency (ESA) mission of utmost scientific importance providing further confirmation of the company’s leading position in highly complex AOCS/GNC systems for the science-technology market.
Finally, SENER and ACCIONA together form the consortium chosen to develop the turnkey project of the Kathu solar thermal plant, South Africa. This complex is led by GDF SUEZ with South African partners with a forecast investment of more than EUR 500 million. It is a 100 MW plant with parabolic troughs designed and patented by SENER and a thermal energy storage capacity of 4.5 hours, thanks to the use of molten salts. The plant will begin operations in 2018 and will be able to supply electricity to 80,000 homes.
News based on the press releases issued by SENER:
Image: Euclid Consortium
The joint venture of SENER and AFCONS has recently signed an EPC contract with H-Energy Gateway Private limited (HEGPL), a Hiranandani Group Company, for turnkey engineering, procurement and construction (EPC) of its LNG storage and re-gasification project in Jaigad, Maharashtra. The capacity of the plant is 8 million tons per annum and facility construction is set to commence from mid this year.
The engineering and technology group SENER has also been awarded the contract for the Attitude and Orbit Control System (AOCS/GNC) on the space probe Euclid. This award makes SENER the prime contractor for this AOCS subsystem that requires the highest level of performance, and for a European Space Agency (ESA) mission of utmost scientific importance providing further confirmation of the company’s leading position in highly complex AOCS/GNC systems for the science-technology market.
Finally, SENER and ACCIONA together form the consortium chosen to develop the turnkey project of the Kathu solar thermal plant, South Africa. This complex is led by GDF SUEZ with South African partners with a forecast investment of more than EUR 500 million. It is a 100 MW plant with parabolic troughs designed and patented by SENER and a thermal energy storage capacity of 4.5 hours, thanks to the use of molten salts. The plant will begin operations in 2018 and will be able to supply electricity to 80,000 homes.
News based on the press releases issued by SENER:
- Engineering, procurement and construction of LNG storage and re-gasification project
- Euclid project
- Solar termal plant project
Image: Euclid Consortium
More news
14/12/2018
The Open Innovation Forum matches business challenges to academic solutions
07/12/2018
2017 BioCat report: The best of the Bioregion of Catalonia
30/11/2018
Barcelona Synchrotron Park’s Commitment to Sustainable Growth
23/11/2018
Astronomers led by IEEC reveal a cold super-Earth around Barnard’s star
16/11/2018
CRAG’s Researchers discover how to generate plants with enhanced drought resistance
08/11/2018
The Barcelona manifesto: for a city-led science and technology diplomacy